Division 02 · HS 84 · 85 · 90
Machinery
Industrial plant & capital equipment
Capital equipment and industrial plant procured against process requirements. We specify with the buyer's engineering team, verify at the factory, and stay with the consignment through installation handover.
- HS chapters
- HS 84 · 85 · 90
- Typical mode
- Break-bulk · flat rack · OOG
- Inspection
- Witnessed FAT at works
- Documentation
- CE / IEC conformity, GA drawings
- Incoterms
- EXW · FOB · CFR · CIF · CPT · CIP · DAP · DDP
- Origin
- Global — sourced on specification
Operations
Machinery in the field.
Library imagery — client photos pending




How this division works
Specified, verified, then shipped.
The order is deliberate. Nothing is committed until the specification is agreed, and nothing leaves the works until it has been inspected against that specification.
Plant procurement
Production lines and process plant specified against throughput, utilities and site constraints — not against a brochure.
Factory acceptance
Witnessed FAT at the manufacturer's works before despatch, with a written report issued to the buyer.
Spares & tooling
Commissioning spares and consumable tooling packaged with the primary consignment to avoid a second landed-cost event.
Indicative scope
What we move under this division.
A representative list, not a catalogue and not a price list. If your requirement sits near this scope, send the specification — we will confirm sourcing before quoting.
- 01CNC machining centres, lathes and grinders
- 02Packaging, filling and labelling lines
- 03Material handling — conveyors, hoists, forklifts
- 04Compressors, pumps and pressure vessels
- 05Injection moulding and extrusion equipment
- 06Precision instrumentation and metrology equipment